top of page
Search

How to Plan Parking Lot Work Around Tenants and Customers

Keith Ross
Oct 15
3 min read

Updated: Oct 16

The work goes more smoothly when people know where to park and what changes next.

Start With Access Before Announcing Dates

An occupied property's maintenance plan needs to account for people as well as pavement. Before sending a notice, establish which areas will close, how vehicles will move and what access needs to remain available.

The right sequence depends on the layout and the work. Repairs, paving, coating and striping can have different access requirements, so a schedule should follow the actual project rather than a generic one-day assumption.

Identify the Routes People Depend On

Mark customer entrances, resident parking, loading areas, refuse access and the paths people use to reach buildings. Include accessible routes and any essential service access that must be maintained appropriately.

Ask the property contact where problems usually occur. A gate that opens only at certain times or a delivery truck that arrives each morning can affect the plan.

For a residential community, consider vehicles that are rarely moved and residents who may need additional notice or assistance arranging access.

Decide Whether Sections Are Practical

Dividing a lot into sections can preserve some parking during work. It can also create more coordination, additional transitions and different construction logistics.

A staged plan is useful only if the remaining area provides workable access and the crew can complete the selected treatment properly. Discuss the tradeoffs with the contractor before promising uninterrupted parking to tenants.

If a complete closure is necessary for part of the work, give it a clear place in the schedule.

Put One Person in Charge of Communication

Choose a property contact who can approve the plan, distribute notices and handle questions from occupants. The contractor should know who can make decisions when site conditions or access issues arise.

Keep the information consistent. Different instructions from an owner, manager and tenant can lead to vehicles being parked in the wrong area at the wrong time.

A simple map can communicate closures more effectively than several paragraphs of directions.

A Useful Notice Answers Five Questions

  • Which area is being worked on?

  • When must vehicles be removed?

  • Where should people park or enter instead?

  • Who should they contact with an access issue?

  • How will they know the area is ready to reopen?

Avoid promising a reopening time that has not been confirmed for the work and conditions. Explain how updates will be communicated if the plan changes.

Check the Property Before Work Begins

Confirm that vehicles and movable items are out of the work area. Review deliveries and access arrangements with the people who control them.

If repairs, sealcoating and striping are included, make sure the sequence is understood. Reopening after one step may interfere with the next.

The final markings also need to follow the intended layout. Resolve changes before the crew is ready to stripe.

Reopen Deliberately

A surface that looks finished is not necessarily ready for traffic. Follow the contractor's project-specific instructions and remove barriers only when the area is cleared for use.

Keep notices and maps available until the last section is open. A partial reopening is often when drivers are most likely to assume every area is available.

Bring the Access Plan Into the Estimate Conversation

Tri County Asphalt works with property managers and commercial owners across the Central Valley. Tell us how the property operates when requesting the estimate so coordination is considered from the beginning.

 
 
 

Comments


bottom of page